Sell wet corn or dry it?
Three ways to market wet corn, compared on net dollars: take the wet discount, let the elevator dry it, or dry it yourself.
1 The load
1,000.0 wet bushels at 56 lb
2 Buyer's terms
3 Your dryer
Fuel + electricity; see the drying cost calculator.
Net revenue, 5.5 points over base
Defaults are Iowa State's AgDM A2-32 example (1,000 wet bushels of 20.5% corn, $5 corn). Costs of on-farm drying here are what you enter; include fuel, electricity and anything else you'd count. Hauling, storage and price changes over time aren't included.
Iowa State's worked example
Ag Decision Maker A2-32 starts with 56,000 lb of corn at 20.5% moisture, which is 1,000 wet bushels, and $5.00 corn with a 15% base:
- Sell wet: a 2% price discount per point over 15% is 11%, so $4.45 × 1,000 = $4,450.
- Elevator dries: shrink of 1.4% per point × 5.5 = 7.7%, leaving 923 bushels ($4,615), less a drying charge of $0.048 per point (5.5 × $0.048 × 1,000 = $264) = $4,351.
- Dry on the farm: 44,520 lb of dry matter ÷ 0.85 = 52,376 lb at 15%, less a 1% handling loss (560 lb) = 51,816 lb, or 925 bushels ($4,625), less drying at $0.045 per bushel per point ($247.50) = about $4,377.
In that example, selling wet comes out ahead. Change the discount, the elevator's shrink factor or your drying cost and the answer changes, which is the point of running your own numbers.
Things the comparison leaves out
- Dryer capacity: if the dryer is the bottleneck, harvest slows and field losses grow.
- Price over time: drying on the farm usually goes with storing, which has its own costs and price risk.
- Trucking and wait times at the elevator, and whether the elevator's charges rise in steps with moisture.
Work out your on-farm cost per point with the drying cost calculator; Iowa State's A2-31 adds ownership, repairs and labor to energy.
Sources
- Iowa State University Extension, Ag Decision Maker A2-32: Grain Drying and Shrink (Edwards)
- Purdue Extension NCH-61: Calculating Grain Weight Shrinkage in Corn Due to Mechanical Drying (Hicks & Cloud)
- University of Minnesota Extension: Energy costs for corn drying and cooling
Estimates for planning. Your buyer's scale ticket, discount schedule and contract terms decide what you're paid. Methodology.